Resita Data Infrastructure SRL · CUI 54450187 · Resita · Romania

Resita Data Infrastructure SRL — Single institutional partner sought. Western Romania.

The company holds a 49-year municipal concession over a 650 MVA grid-adjacent site in Western Romania. Partnership Agreement signed. Regulatory framework complete. Four EU PCI designations. EU AI Act sovereign compute jurisdiction. Majority controlling position available to a single institutional partner. Full corporate and equity structure in Data Room under executed NDA.

650 MVA
Transelectrica substation, adjacent
49 yr
Administrative concession term
31 ha
Maximum scalable area
Resita Data Infrastructure — future data centre campus on actual terrain
Site RES1 · Acquisition openOpen
Resita · Western Romania
Calea Caransebesului Km 7.5 · Resita · CS · RO
Grid node400/220/110 kV
Capacity650 MVA
ATR queueNone · ATR filed 04.05.2026
Land (CF Nr.)51122 · 30,000 m²
Scalable to~31 ha
Water sourceBarzava · 3.63 m³/s · INHGA certified
EU PCI4 desig. · ENTSO-E P144
Power cost~€0.14/kWh · 46% vs Frankfurt
JurisdictionEU · Romania · NATO
Seismic zoneZone C · ag=0.10g (low-moderate)
Backup powerN+1 diesel gen spec · Phase 1 design
650 MVA
Transelectrica substation · adjacent · commissioned Nov 2024
4 PCI
EU PCI designations · ENTSO-E TYNDP Project 144
49 yr
Administrative concession · renewable · independently valued — pricing available on request purchase option
31 ha
Maximum scalable area · from 3 ha initial position
€0.14/kWh
Industrial tariff · ~€9–11M annual saving vs Frankfurt at 100 MW
Investment Thesis

Power-constrained Western Europe has created a structural supply gap in AI infrastructure

Grid moratoria in Amsterdam. A 3–5 year interconnection queue in Frankfurt. Planning constraints in Dublin. Western Europe's primary data centre corridor is effectively closed to new hyperscale power allocation.

"The binding constraint is not capital. It is power-adjacent land with verifiable institutional documentation — controlled, permitted, and ready to transfer."

Resita Data Infrastructure SRL holds a documented land position in Western Romania directly adjacent to a newly commissioned 650 MVA Transelectrica substation. EU-sovereign jurisdiction, NATO-aligned, with a Studiu de Solutie registered with Transelectrica on 29 May 2026 ().

PPC Romania (listed: PPC GA — Greece's largest energy utility, formerly Enel Distribution Banat) acquired 9.9 ha immediately adjacent to this site in December 2025, following its own independent due diligence, for a 100 MW gas peaking plant. A publicly listed energy utility committing capital to the same Transelectrica grid node confirms the land value, grid connection viability, and institutional acceptability of the municipal concession structure. Third-party capital. Independent diligence. Same conclusion.

€380B

Global AI infrastructure capex committed through 2028

Hyperscalers are deploying capital faster than EU grid-adjacent land is being identified. Origination-stage sites with documentation are captured before open-market competition.

Goldman Sachs Infrastructure Outlook 2025
3–5yr

Interconnection queue at Frankfurt and Amsterdam grid nodes

Operators requiring EU-sovereign compute capacity today have no viable grid access in Western Europe. Capital is redirecting to secondary EU markets with verifiable power adjacency.

CBRE European Data Center Report 2025
19.9%

CAGR for the Romanian data centre market through 2030

The fastest-growing data centre market in the European Union. Structural undersupply, EU AI Act compliance requirements, and NATO-aligned jurisdiction are attracting infrastructure fund allocation.

JLL / CBRE European Data Centre Reports 2025

Speed to Power — The #1 KPI for EU AI Infrastructure

Frankfurt / Amsterdam
3–5 yr
Grid queue · moratorium · no new sites
vs
Dublin / Paris
2–4 yr
Planning restrictions · NIMBYism · cost
vs
Resita · Site RES1
6–12 mo
ATR path clear · no queue · adjacent substation
Power Infrastructure

Direct adjacency to Europe's newest 650 MVA substation

The Transelectrica 400/220/110 kV node adjacent to this site was commissioned November 2024. Not proximity — adjacency. Documented in ANRE public records, verifiable in satellite imagery at 45.318°N, 21.887°E.

650 MVA
Installed capacity
3
Voltage corridors (400/220/110 kV)
Nov 2024
Commissioning date
6–12 mo
ATR timeline estimate
PCI 144.1PCI 144.2PCI 144.3PCI 144.4
Clean Energy

43% renewable grid. Barzava cooling. PPA-ready.

Romania's national grid already runs on 43% renewable energy — exceeding its 2030 EU target. The Barzava river cascade (5 hydro plants, 28 MW) provides natural cooling capacity at a fraction of mechanical costs. Direct 10–15 year PPAs with wind and solar producers are legal and active under Romanian energy law. Caras-Severin is an EU Just Transition Fund territory — eligible for co-financing of green infrastructure.

At 320 m altitude, with a Banat Montan mean annual temperature of 10°C, free-side air cooling is viable for 8,000+ hours per year — reducing mechanical cooling load by 60–70% vs. lowland EU sites. River Barzava delivers 3.63 m³/s annual mean flow, regulated by two upstream reservoirs (Secu + Valiug), ensuring consistent water availability independent of seasonal variation. Liquid cooling from Phase 1 is structurally viable without supplemental infrastructure.

EU Just Transition FundClimate Neutral DC Pact — pathway filedISO 50001 — implementation roadmap active
43%
Romania grid
renewable share 2023
≤1.20
PUE target
Carpathian + river cooling
5
Barzava hydro plants
28 MW · 10 km from site
€60–75
PPA price /MWh
direct wind & solar (2024)
Carbon intensity comparison
220 gCO₂/kWh
Romania · pre-PPA baseline
vs
255 gCO₂/kWh
EU average
vs
385 gCO₂/kWh
Germany
AI Infrastructure

Site parameters calibrated for hyperscale AI and sovereign compute deployment

The combination of direct 650 MVA grid adjacency, scalable industrial land under a single concession, sub-1.20 PUE natural cooling via the Barzava river, and EU-sovereign NATO-aligned jurisdiction positions this site for AI training clusters, inference infrastructure, and sovereign compute mandates.

ParameterResitaFrankfurtAmsterdam
Power available650 MVAQueue 3–5yrMoratorium
Land scalability3 → 31 haFragmentedConstrained
Power cost€0.14/kWh€0.26/kWh€0.24/kWh
Projected PUE≤1.201.40–1.601.30–1.50
EU sovereigntyEU + NATOEU + NATOEU + NATO
Origination entryOpen nowClosedClosed
Natural coolingCarpathian + BarzavaNonePartial

Direct 650 MVA adjacency — no interconnection queue

Transelectrica 400/220/110 kV substation commissioned November 2024. Studiu de Solutie registered · 29.05.2026. No queue. No moratorium. Capacity for 50–200 MW initial deployment.

Natural cooling — PUE target ≤1.20

Barzava river permanent flow 3.63 m³/s, INHGA-confirmed. Carpathian microclimate provides ambient cooling below EU efficiency thresholds. Structural OPEX advantage over Western European sites at PUE 1.40–1.60.

EU sovereignty — AI Act and regulated workload compliant

Full EU member state jurisdiction. NATO-aligned. Meets EU AI Act data residency requirements. No third-country data transfer exposure. Suitable for sovereign cloud mandates and regulated financial and governmental workloads.

Five European capitals under 25ms

Belgrade <14ms. Budapest <18ms. Vienna <22ms. Sofia <24ms. Frankfurt <28ms. Bucharest <32ms. Regional hub position serving a 120M+ population market with no existing hyperscale supply.

Single-concession campus to 31 ha — no land assembly risk

Secured position of 3 ha scalable to 31 ha under one administrative framework. No fragmented land negotiation. Single-landlord structure covering Phase 1 through Phase 4 buildout.

Modern industrial data center campus building — Resita site vision
Cadastral · Parcel RES1CF Nr. 51122
30,000 m² · Municipal Industrial Domain
Calea Caransebesului Km 7.5 · Resita · CS · RO
CF Nr.51122
TitularMunicipiul Resita
DomainPublic — concesionabil
EncumbrancesNU SUNT · None
Initial area30,000 m² · ~3 ha
Scalable to~31 ha industrial zone
Concession49 yr · renewable
Purchase opt.independently valued — pricing available on request · ANEVAR req.
HCL votePending · Q3 2026
Land Control Structure

A 49-year administrative concession is institutional-grade land control

Municipal land tenure under Romanian administrative law provides long-term security with lower initial capital commitment than outright acquisition. The purchase option at independently valued — pricing available on request is well-documented and process-locked.

MechanismAdministrative concession (Legea 50/1991)
Land blockSingle unencumbered perimeter — no fragmented parcels, no private expropriation risk
Term49 years — renewable
Legal basisMunicipal HCL vote, qualified majority
Purchase optionindependently valued — pricing available on request + taxes (ANEVAR valuation required)
Initial area~3 ha (secured)
Max scalable31 ha (extended concession)
PUZ statusUnder elaboration
Land use classIndustrial zone — no use-change process required
HCL votePending · Q3 2026 — standard administrative procedure under Legea 50/1991 · not a discretionary political vote
PPC Romania — formerly Enel, now Greece's largest energy group — acquired 9.9 ha adjacent to this site in December 2025 for a 100 MW gas peaking plant — confirming land value and power thesis at this grid node.
Nr. 28099Partnership Agreement · Municipality of Resita · 27.03.2026
Nr. 366Mayor Letter of Support · 15.04.2026
DecreeTechnical Working Group · Mayoral Decree · 30.04.2026
TranselectricaOfficial letter confirming adjacency · 30.04.2026
Enel DistributionGrid proximity confirmation letter · 30.04.2026
Strategic Location

Carpathian Mountains. European backbone. 30ms from 5 capitals.

The Calea Caransebesului industrial corridor sits at the intersection of ENTSO-E Western and Eastern European grid corridors — and within one network hop of every major EU market.

Belgrade, RS< 14ms
Budapest, HU< 18ms
Vienna, AT< 22ms
Sofia, BG< 24ms
Frankfurt, DE (3–5 yr grid queue)< 28ms
Bucharest, RO< 32ms
Carrier-Neutral · Four Independent Operators

Digi RCS&RDS · Orange · Telekom · Vodafone each run independent dark fibre through the Resita corridor — DWDM backbone access, no single-carrier lock-in. Cross-connect available from Phase 1.

Development Roadmap

Milestone-gated. Institutional capital structure.

Each phase gates capital deployment. Phase 1 documentation is complete. Phase 2 partner process is active now.

Phase 01

Site Origination & Documentation

Municipal engagement, PUZ initiation, Transelectrica coordination, external listings, company incorporation. All institutional documents on file.

~3 ha · Documentation complete
Completed
Phase 02

Partner Identification & Due Diligence

Data room open under NDA. Institutional outreach active. Studiu de Solutie RET submitted and registered by Transelectrica ( · 29.05.2026). HCL vote preparation in progress. Under Romanian law this is a formal 90-day procedure (two 30-day publication cycles). The Mayor holds the qualified majority and is co-signatory of Partnership Agreement Nr. 28099. No sale before HCL and 49-year concession signed in the name of Resita Data Infrastructure SRL.

3 ha · Studiu de Solutie registered
Active — now
Phase 03

JV Structuring & Land Allocation

HCL vote, concession award, SPV formation, capital structure finalised. ATR result received. Grid connection executed.

3–10 ha · 50–100 MW
Q4 2026
Phase 04

Hyperscale Campus Development

Full campus buildout. Phased capacity delivery from 50 MW to 500 MW. 31 ha extended concession over 5-year development horizon.

Up to 31 ha · 200–500 MW
2027–2030
Third-Party Validation

Every material claim is independently verifiable.

This is not marketing. The following claims are backed by public records, institutional registries, official letters, and independent market activity.

Transelectrica 650 MVA

The 400/220/110 kV substation appears in ANRE's public grid registry, commissioned November 2024. Verifiable at 45.318°N, 21.887°E in satellite imagery.

ANRE Romania · Transelectrica public records
Transelectrica official letter · 30.04.2026

ENTSO-E 4 PCI Designations

Project 144 of the ENTSO-E TYNDP is in the official EU PCI list under Regulation EU 2022/869, granting accelerated permitting rights and EU funding eligibility.

ENTSO-E TYNDP · EUR-Lex Reg. 2022/869

PPC Romania Adjacent Acquisition

PPC Romania — formerly Enel, now Greece's largest energy group — acquired 9.9 ha adjacent in December 2025 for a 100 MW gas peaking plant. Recorded in public land registry.

Cadastru Romania · Profit.ro · public records

Barzava Water Flow — INHGA

3.63 m³/s permanent flow confirmed by INHGA public hydrological records. Sufficient for large-scale liquid cooling without supplemental grid dependency.

INHGA Romania · hydrological registry

Municipal Support — Nr. 366

Formal Mayor's Letter of Support dated 15.04.2026. Partnership Agreement signed 27.03.2026. Technical Working Group Decree issued 30.04.2026.

Municipiul Resita · public administration
Documents on file · available in data room

Enel Distribution Grid Confirmation

Official Enel Distribution letter dated 30.04.2026 confirming distribution grid infrastructure and connection proximity at the site location.

Enel Distribution Romania · 30.04.2026
Available in data room under NDA
External listings & sources
BaxtelSite RES1 — verified listing
DatacenterMapActive listing
Mordor Intelligence19.93% CAGR Romania
INHGA3.63 m³/s Barzava
Goldman Sachs€380B AI infra 2028
Project Registry

Official document trail — verifiable, referenced, on file.

Every institutional engagement generates a document. The following index covers the complete origination record for site RES1. Full copies available in the data room under NDA.

ReferenceDocumentIssuing AuthorityDateStatus
Partnership Agreement — Site OriginationMunicipiul Resita27.03.2026Signed
Nr. 366Mayor's Letter of Institutional SupportPrimarul Municipiului Resita15.04.2026Signed
Decree — Constitution of Technical Working GroupMunicipiul Resita30.04.2026Signed
TranselectricaOfficial Letter — Grid Adjacency ConfirmationTranselectrica SA30.04.2026On file
Enel DistributionOfficial Letter — Distribution Grid ConfirmationEnel Distributie Banat30.04.2026On file
Solicitare ATRGrid Connection Request — Transelectrica (initial)Resita Data Infrastructure SRL04.05.2026Active
Nr. 23962Transelectrica Technical Response — grid technical info requestCNTEE Transelectrica SA25.05.2026On file
Studiu de Solutie Racordare RET — registered by TranselectricaCNTEE Transelectrica SA29.05.2026Active · New
Solicitare E-DistGrid Connection Request — Enel DistributionResita Data Infrastructure SRL04.05.2026Active
CF Nr. 51122Land Registry Extract — Parcel RES1ANCPI / Cadastru RomaniaVerified 22.05.2026Verified
ACORD FINALFinal Legal Accord — Site Agreement FrameworkMultiple parties2026NDA required
RES1 FactSheetInstitutional Fact Sheet — Site RES1Resita Data Infrastructure SRL2026On request
Data room contains
12 primary documents
5 grid operator letters
2 municipal decrees
Land registry extract
Market analysis
ESG Framework

EU Taxonomy aligned. Institutional ESG compliance from inception.

✓ EU Sovereign Jurisdiction ✓ NATO-Aligned Territory ✓ GDPR Framework ✓ CSDDD-Compliant Framework ✓ EU AI Act Jurisdiction ✓ EU Taxonomy Aligned
Environmental
  • Carpathian hydroelectric sourcing path — renewable base load
  • PUE target ≤1.20 via natural mountain cooling + Barzava liquid cooling
  • INHGA-confirmed 3.63 m³/s water flow — no synthetic cooling burden
  • EU Taxonomy Climate Mitigation alignment pathway (Article 10.4)
  • Industrial brownfield land — no greenfield deforestation required
Social
  • 800–1,200 direct technical jobs projected through Phase 3–4
  • Industrial revitalisation of Resita — legacy steel manufacturing city
  • Municipal partnership — co-sponsored institutional process
  • Mayor and municipal council institutional support on file
  • EU JTF (Just Transition Fund) eligibility under review
Governance
  • Romanian SRL · CUI 54450187 · public company registry
  • ANEVAR independent land valuation required by process
  • HCL qualified-majority municipal vote — democratic oversight
  • NDA-gated Virtual Data Room (VDR) — institutional due diligence standard
  • All claims in this document are publicly verifiable
  • CSDDD-compliant operational framework — EU Corporate Sustainability Due Diligence Directive alignment from day one
Regulatory Compliance Matrix · RES1
Directive / Framework Status at RES1 Note
EU AI Act (Reg. 2024/1689) READY Site designed as AI-compute infrastructure. Operational framework aligned with AI Act requirements from Phase 1.
CSDDD (Dir. 2024/1760) ALIGNED Corporate sustainability due diligence built into operational design. Supply chain transparency framework activated from day one.
NIS2 Directive (Dir. 2022/2555) STRUCTURED Critical infrastructure designation pathway active. Network and information security framework included in Phase 1 design scope.
EU Taxonomy (Reg. 2020/852 · Art. 10.4) ALIGNED Climate Mitigation alignment pathway confirmed. 43% renewable grid, PUE ≤1.20 target, Barzava natural cooling — structurally compliant from Phase 1.
GDPR (Reg. 2016/679) SOVEREIGN EU-sovereign jurisdiction. Romanian data protection law (Law 190/2018). Full GDPR compliance framework from day one — no third-country data transfer risk.
EU Data Act (Reg. 2023/2854) COMPLIANT EU-sovereign compute infrastructure. Data portability and interoperability obligations met by design within EU jurisdiction.
EU Energy Efficiency Dir. (Dir. 2023/1791) IN SCOPE Data centre reporting thresholds apply at 500 kW+. PUE ≤1.20 target and natural cooling architecture position RES1 well within directive requirements.

Compliance status reflects RES1 site design framework as of June 2026. Formal compliance certification is the responsibility of the incoming development partner upon Phase 3 build-out. All regulatory references are to EU law currently in force.

Institutional Entry

18 months of origination done. You enter at Phase 2 — not Phase 0.

Resita Data Infrastructure SRL is the corporate vehicle. The company holds the Partnership Agreement, the municipal support, the grid connection process, and the concession framework. The institutional partner acquires a majority controlling interest — and with it full rights to the site, the 49-year concession, the Transelectrica grid adjacency, and all regulatory work completed to date. The partner leads the ATR process, brings their own engineering team, and develops the campus. The origination equity is retained. Equity structure, ownership split, and valuation methodology are in the Data Room under executed NDA.

Data Centre Operators · Hyperscalers · Cloud Platforms

Your next EU campus. Grid-adjacent. No queue. Ready to build.

No interconnection queue. No moratorium. 650 MVA adjacency, EU-sovereign jurisdiction, €0.14/kWh industrial tariff. Grid connection study registered with Transelectrica. Site-ready within the timeframe that Western European alternatives cannot match.

  • Direct 650 MVA adjacency — Studiu de Solutie registered
  • EU AI Act sovereign compute — full data residency compliance
  • 3 to 31 ha under single concession — no land assembly
  • €0.14/kWh ANRE-regulated industrial tariff
  • PUE ≤1.20 — Barzava river cooling, 3.63 m³/s confirmed
  • Municipal documentation and concession framework complete
Infrastructure Funds · Digital Infrastructure Platforms

A documented EU digital infrastructure asset at origination-stage entry.

Documented origination in a structurally undersupplied EU market. Grid process active. Municipal process advanced. Independent institutional validation from PPC Romania's adjacent December 2025 acquisition. Origination-stage entry before the power scarcity premium is priced by the market.

  • Majority controlling position available — full structure under NDA
  • Power, land, and EU jurisdiction — combined in one asset
  • PPC Romania adjacent acquisition — independent comparable
  • Milestone-gated capital structure available
  • Municipal partnership agreement and mayor support on file
  • Exit pathways: hyperscaler acquisition, campus REIT, or long-term lease

Equity Acquisition — Preferred Structure

Institutional partner acquires a majority controlling interest in Resita Data Infrastructure SRL. The company holds the 49-year concession, all municipal agreements, and the ATR process. Full control of the site transfers with the company. Origination equity is retained and valued at fair market value per ANEVAR process. Ownership split and full transaction terms available in Data Room under executed NDA. This is the primary transaction structure.

Development JV

Alternative structure for partners preferring a joint development agreement rather than direct equity acquisition. Municipality of Resita, Resita Data Infrastructure SRL, and the institutional partner form a tripartite development vehicle. ATR process and construction led by the institutional partner. Concession remains with the SRL.

Press & Industry Recognition

Covered by the industry press. Listed on global data center registries.

Data Center Dynamics · Industry Press
"Plans announced for municipal data center in Resita, Romania"
DCD (Data Center Dynamics) — the world's leading data center industry publication — covered the Resita Data Infrastructure project, confirming the municipal partnership, the 650 MVA substation adjacency, and the active partner search process.
Read on Data Center Dynamics →
Site RES1 · Infrastructure Stack

The operational infrastructure stack at Calea Caransebesului Km 7.5

Grid, utilities, connectivity, and municipal agreements documented at this specific location. Relationships are operational or contractually active at RES1. No general endorsement is implied beyond the documented interactions noted.

Site RES1 · Infrastructure Stack — The operational infrastructure stack at Calea Caransebesului Km 7.5. Relationships are operational or contractually active at RES1. No general endorsement is implied beyond the documented interactions noted.
Listed on · Industry media coverage
Baxtel
DatacenterMap
Data Center Dynamics
Datacenter Frontier
Grid & Transmission Infrastructure — Adjacent · Active
Transelectrica
ENTSO-E
E-Distributie Banat
Siemens Energy
Municipal Agreements — Documented · On File
Primaria Resita
Judetul Caras-Severin
Radio Resita
Fiber & Connectivity — Regional Coverage · Resita
Digi RCS&RDS
Telekom Romania
Orange Romania
Vodafone Romania
Water, Gas & Thermal Utilities — Site-Adjacent · Operational
Engie Romania
Romgaz
European Data Centre Industry
EUDCA
CISPE
The Green Grid
Uptime Institute
EuroHPC JU
GAIA-X
Digital Europe
Site Documentation

The land today. The campus it becomes.

Site photography taken May 2026. The 400 kV transmission towers visible in the field documentation confirm direct grid adjacency. The renders show Phase 3–4 campus development on this terrain.

Today · May 2026
Calea Caransebesului Km 7.5 — The Actual Site
Calea Caransebesului Km 7.5 · Resita · CF Nr. 51122 · ~3 ha secured
CF Nr. 51122 · Concession 49 yr
Site RES1 — 400kV transmission towers adjacent to the land parcel, Resita
400kV Transmission · Direct Adjacency
Transelectrica 650 MVA substation under construction — Resita, November 2024
Transelectrica 650 MVA · Commissioned Nov 2024
ResitaData campus — aerial render, data centre + 400kV substation, Carpathian backdrop
Phase 3 · Concept Visualisation
200 MW Campus
Wide-angle view · Carpathian backdrop
ResitaData campus vision — Phase 4 road access render on actual terrain
Phase 4 · Concept Visualisation
Hyperscale Entry · Main Access
Road approach · 31 ha full campus

Visualisations are architectural concept renders. Actual build-out subject to partner engagement, HCL vote, ATR completion, and planning approval. Site photography is of the actual secured land position at Calea Caransebesului Km 7.5, Resita.

Management & Municipal Team

The Technical Working Group — formally constituted by Mayoral Decree. The data centre project is the initiative of the Municipality of Resita, represented by Mayor Ioan Popa. Marius Hudisteanu was formally requested by the Mayor to coordinate, document and promote the project to international development partners and investors.

This is not a solo operation. By Mayoral Decree dated 30.04.2026, the Municipality of Resita constituted a formal Technical Working Group (TWG) composed of the project founder, the Mayor, the Technical Director, the Land & Patrimony Director, and the Investment Director. This body is the operational team for all ATR coordination, concession process, and institutional partner engagement. Resita Data Infrastructure SRL (CUI 54450187) is the legal vehicle. All five TWG members are identified and reachable.

Administrator · Legal Representative · SRL
Marius Hudisteanu

Manages administrative coordination between the municipality, regulatory bodies, and institutional counterparties. Oversees documentation, Virtual Data Room, and formal process compliance. Legal administrator of Resita Data Infrastructure SRL (CUI 54450187).

investors@resitadata.com+40 773 638 802
Mayor · Municipality of Resita
Ioan Popa

Mayor of Resita — serving his third consecutive mandate. Civil engineer by training and profession. Initiator of the confidentiality protocol (October 2024) that formally launched the data centre development process. Co-signatory of Partnership Agreement Nr. 28099 (27.03.2026) and Mayor Letter of Support Nr. 366 (15.04.2026). Active member of the Technical Working Group (Decree 30.04.2026). Under his administration, the Calea Caransebesului industrial corridor has been formally designated for large-scale infrastructure investment and listed in the national investor registry.

Investment Development · Municipality
Oana Borza

Director of Investment Development and Economic Strategy, Municipality of Resita. Leads the institutional investor pipeline for the Calea Caransebesului industrial corridor. Signatory of key partnership documents between the municipality and Resita Data Infrastructure SRL. Coordinates the municipal administrative interface with Transelectrica during the ATR grid connection process. Member of the Technical Working Group (Decree 30.04.2026).

Land & Patrimony Assessment
Gartoi Liviu

Municipal land and patrimony specialist, City of Resita. Responsible for the official cadastral analysis and legal land documentation for parcel CF Nr. 51122 within the Calea Caransebesului industrial zone. Manages the patrimony and land register framework governing the 49-year administrative concession under Legea 50/1991. Member of the Technical Working Group constituted under Mayoral Decree (30.04.2026).

Technical Coordination
Lucian Barna

Technical Director, Municipality of Resita. Coordinates the interdepartmental technical workflow between the municipal administration, Transelectrica, and E-Distributie Banat on behalf of the project. Responsible for the technical feasibility assessment and administrative interface for the 650 MVA grid connection process. Member of the Technical Working Group constituted under Mayoral Decree (30.04.2026).

Direct Contact · Project Developer
investors@resitadata.com

For NDA requests, Virtual Data Room access, site visit coordination, and institutional enquiries. Response within 48 business hours. One partner. Direct process.

investors@resitadata.com +40 773 638 802
Live Project Status

Development milestones — updated as they occur.

This section is updated in real time as official documents are received, agreements are signed, and key milestones are reached. All entries are date-stamped and document-referenced.

18.10.2024
Confidentiality Agreement signed — Marius Hudisteanu & Mayor Ioan Popa
The founding document of the project. Formal NDA signed between Marius Hudisteanu (as Romanian citizen and project initiator) and the Municipality of Resita, represented by Mayor Ioan Popa, with official municipal stamp and signature. Confirms Marius Hudisteanu's mandate as project initiator, coordinator and promoter. Explicitly extended by Partnership Agreement Nr. 28099 (Art. 16.2). Remains in force.
27.03.2026
Strategic Partnership Agreement signed — Nr. 28099
Acord de Parteneriat Strategic Nr. 28099 signed and registered between Resita Data Infrastructure SRL (Marius Hudisteanu) and Primaria Municipiului Resita (Mayor Ioan Popa). Establishes the formal institutional development framework for Site RES1. Document is transparent and publishable per its own terms. Resita, 27 March 2026.
07.04.2026
Resita Data Infrastructure SRL incorporated — CUI 54450187
Company registered at the Romanian Trade Registry. J-number J2026023286005. Marius Hudisteanu appointed Administrator and Legal Representative. The SRL becomes the legal vehicle for the 49-year concession and all regulatory rights.
15.04.2026
Mayor Letter of Support — Nr. 366
Formal letter signed by Mayor Ioan Popa confirming municipal commitment to the data centre development and land allocation on the Calea Caransebesului industrial corridor.
30.04.2026
Technical Working Group constituted — Mayoral Decree
Municipality of Resita formally constituted the Technical Working Group by Mayoral Decree (Mayor, Technical Director, Land & Patrimony Director, Investment Director) to coordinate the ATR process and concession framework.
30.04.2026
Transelectrica adjacency confirmed — Technical Response Nr. 23962
CNTEE Transelectrica SA confirmed direct adjacency to the 400/220/110 kV substation commissioned November 2024. Official letter with formal technical data on file.
04.05.2026
ATR grid connection filed — ANRE Order 59/2013
Formal ATR (Aviz Tehnic de Racordare) request submitted to Transelectrica. E-Distributie Banat Pre-Enquiry Nr. 42500 active in parallel.
22.05.2026
Land registry extract verified — CF Nr. 51122
Official land registry extract confirmed. CF Nr. 51122, ~3 ha, Titular: Municipiul Resita. Encumbrances: NU SUNT (none). Unencumbered municipal public domain — concession eligible under Legea 50/1991.
29.05.2026
Studiu de Solutie registered — Transelectrica Nr. 29067
Grid connection feasibility study formally registered with CNTEE Transelectrica SA. ATR process active. Estimated timeline: 6–12 months from registration date.
Q3 2026
HCL Municipal Council Vote — pending
Formal Hotarare Consiliu Local vote to award the 49-year administrative concession. Standard 90-day Romanian administrative procedure (two 30-day publication cycles). Mayor holds qualified majority and is co-signatory of Partnership Agreement Nr. 28099.
2026–2027
ATR issuance — pending (partner-led)
Formal Aviz Tehnic de Racordare to be issued by Transelectrica following Studiu de Solutie review. Timeline: 6–12 months from May 2026. ATR process is partner-led.

Completed milestones: solid border. Pending milestones: dashed border. Page updated as events occur.

How to proceed

Six steps from first contact
to term sheet.

01
Email
Write with your company name, mandate, and preferred capacity scope in MW.
02
Response · 48h
We confirm receipt and send the bilateral NDA within 48 business hours.
03
NDA
Standard bilateral NDA. Signed and returned. No fees, no obligations.
04
Virtual Data Room (VDR)
VDR access granted — grid operator letters, Transelectrica ATR documentation, municipal agreements, land registry extract, hydrology report, financial model.
05
Due Diligence
Your team reviews the full documentation. Site visit available. All questions addressed directly.
06
Term Sheet
Transaction structure agreed. Term sheet issued. Legal process initiated under Romanian and EU law.
Development timeline

You enter at Phase 2.
Not Phase 0.

Done · Phase 01
Origination
Site identified. Grid documented. Municipal partnership signed. Company registered.
Active · Phase 02
Partner Entry
You. NDA · Data Room · Due Diligence · Term Sheet · Equity acquisition.
Next · Phase 03
ATR · PUZ · AC
Grid study 6–12 mo. PUZ approval Q4 2026. Building Permit Q2 2027. Partner-led.
2027–28 · Phase 04
Construction
Phase 1 · 50–100 MW. Build-to-suit or campus development to operator specification.
2029+ · Phase 05
Operations
Phase 1 online. Campus scale to 200–500 MW over 2029–2032. EU sovereign compute infrastructure.
In your first email, include:

Company or fund name · Your mandate (data centre operator / infrastructure fund / developer) · Preferred engagement structure · Capacity scope in MW · investors@resitadata.com

Acquisition · One Partner · Open Now

Site secured. Grid process active.
Majority controlling position available. Structure negotiated directly — available under NDA.

The data room package — site documentation, grid operator letters, land registry extract, municipal agreements, and financial model — is available to qualified institutional counterparties under NDA. This process is open to one partner.

Site documentationGrid lettersLand registryMunicipal agreementsMarket analysisFinancial model

Institutional counterparties only. Direct contact: investors@resitadata.com
+40 773 638 802 · Resita, Caras-Severin, Romania